Asbestos containment work - List of Manufacturers, Suppliers, Companies and Products

Asbestos containment work Product List

1~2 item / All 2 items

Displayed results

Asbestos containment work "JEA method"

Safe, reliable, and low-cost! A new method that changes the common understanding of asbestos containment work has arrived!

Astonishing new method "JEA Method" that changes the common sense of asbestos containment work! By adopting special technology, construction can be completed in a shorter period compared to conventional methods. Since evacuation is only required at the construction site, it is ideal for facilities and apartments where long-term evacuation is difficult. The equipment is compact and does not require large spaces, reducing the costs of protective measures and temporary setups, allowing for significant cost savings along with a shorter construction period. Additionally, since the construction work does not involve entering areas where asbestos may be released, the safety of workers can also be ensured. [For more details, please download the catalog or feel free to contact us.]

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asbestos containment work "Hydro Protector H"

Especially effective in construction sites that are small and require short-term work! After drying, it demonstrates waterproofing properties.

The advantages of the containment (dust prevention) work using "Hydro Protector H" are that the construction period can be completed in a significantly shorter time compared to other methods, and it is also cost-effective. Furthermore, the safety of workers is higher than in removal work, with lower exposure to asbestos dust, allowing for safe construction. It is suitable for dust prevention work on exposed sprayed asbestos surfaces such as ceilings and multi-story parking lots, and it exhibits waterproof properties after drying. 【Features】 ■ Low construction cost ■ Short construction period ■ Wide range of applications ■ Lower exposure to asbestos dust compared to removal work, allowing for safe construction ■ Particularly effective in narrow spaces where short construction periods are required *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration